Ottawa Charter Advantages And Disadvantages

586 Words3 Pages

1. SERVICES In accordance with the deliverables timetable as set out in the General Purpose Consulting Services Agreement Form, the Consultant shall perform the following Services: 1. Participate at a kick-off meeting with the program lead and other staff members from Alberta Infrastructure. 2. Prepare an initial draft report including preliminary overview of emerging and better practices in other jurisdictions and recommendations on the three key deliverables: .1 A Sustainable Return on Investment Evaluation Framework for a minimum of fifteen enhanced sustainable design and construction options; .2 A life-cycle costing and GHG reduction/aversion model (that aligns with Alberta Climate Change Office protocols and standards) for each recommended …show more content…

hospitals, schools, courthouses, office buildings, multi-unit housing, etc.). for each sustainable design and construction option identified, with a focus on: i. On-site and district renewable energy technologies (e.g. solar, wind, geo-thermal, etc.) ii. Co-generation and district energy for campus-style public facilities, iii. Broad scope construction standards for approved new-builds and existing government-owned facilities, including options for building certification / labelling. Standards may include LEED, Living Building Challenge, Net-Zero, Net Zero Ready, and others. .3 Consider impacts of geo-climatic factors, location factors, site factors and building types on the potential GHGs …show more content…

job creation, economic diversification, public awareness, aboriginal engagement, etc.). 4. Deliver a presentation in-person to the on draft and final report. 5. Incorporate feedback and submit a copy of the final report. 2. OTHER SERVICES 1. Provide bi-weekly updates or more as required. 2. Provide any modeling results or other data in hard copy and electronic form. Electronic versions of data and results must be provided in an accessible and editable format (e.g. not pdf). 3. Provide electronic copies of the final report and the final report presentation slide deck and speaking notes; provide 30 bound hard copies of the final report. 4. The Contractor shall perform the Services no later than the completion dates specified as follows: Service/Deliverable Date Participate at a kick-off meeting with the Project Team April 30, 2017 Initial draft report - preliminary overview of concepts/options June 16, 2017 Incorporate feedback and submit draft of detailed framework. July 7,

More about Ottawa Charter Advantages And Disadvantages