conducted during a meeting held near the end of 1881. The project would include building a terminal in downtown Minneapolis and connecting the rails to the Manitoba Railway, the execution for which was accomplished by the Minneapolis Union Railway company, a team that was built for the sole purpose of overseeing the project. The stockholders met for the first time immediately the following year and Col. Charles C. Smith was selected as the head engineer.

The bridge has been altered somewhat from its original appearance. When the lock and dam was built at Saint Anthony Falls, two of the arches were replaced with a truss so barges could pass through the locks. Later, in 1965, flood waters undermined three of the piers and caused the bridge
Open Document