ipl-logo

Snc's Failure: A Case Study

176 Words1 Pages
SNC failed to address security prior to beginning his five paragraph order but tasked a subordinate to provide security only after the brief was concluded. The Orientation paragraph contained minimal information. SNC’s stated “We are operating to get this over there” was his Scheme of Maneuver portion, which was confusing and overly general. SNC failed to assign tasks and addressed minimal portions of the Admin and Logistics paragraph. SNC adequately addressed the remainder of the order, which made sense and was briefed with confidence. SNC began the problem with a poorly thought out plan. SNC began negotiating the obstacle himself and provided subordinates with minimal tasking. SNC was able to negotiate half way through the obstacle,
Open Document